Nanjing GS-mach Extrusion Equipment Co.,Ltd Jacksong@njgsmach.com 86-25-81030382-8:00~17:00
Product Details
Place of Origin: Made in Nanjing
Brand Name: GS-mach
Certification: CE ISO9001
Model Number: GS-16/35/45/65
Payment & Shipping Terms
Minimum Order Quantity: 1
Price: negotiation
Packaging Details: Wooden base plate, damp proof plastic lining, fully-closed plate-box external
Delivery Time: 45 days after receive the payment of deposit
Payment Terms: L/C, T/T, Western Union, MoneyGram
Supply Ability: 100 sets/year
Automatic Grade: |
Semi-automatic |
Supplier: |
Factory Direct |
Tolerance: |
+/- 0.03mm |
Screw Design: |
Single-screw |
Model Number: |
3d Printer Filament Extruder Machine |
Filament Diameter: |
1.75mm-3.0mm |
Automatic Grade: |
Semi-automatic |
Supplier: |
Factory Direct |
Tolerance: |
+/- 0.03mm |
Screw Design: |
Single-screw |
Model Number: |
3d Printer Filament Extruder Machine |
Filament Diameter: |
1.75mm-3.0mm |
Plastic 3D printer filament extruder machine extrusion line with CE ISO9001
General Introduction
3D printing is a revolutionary technology since last year. 3d printing has become more and more popular for all kinds of industries. With the rise of 3D printing technology, our company developed the abs filament production line for 3d printing for 3D printer filament manufacturing. we have sold the ABS filament production line for 3d printing to a lot of developed countries like France, UK, USA, Russia and so on. Our machines are very welcomed because of its multi-advantages:
1 Big capacity compared with other suppliers who use the same model.
2 Lowest tolerance: +/- 0.03 mm. even +/- 0.02 mm.
3 Both 1.75 and 3.00mm filament diameter
4 It can process multi-materials like PLA ABS PET PA HIPS.
5 Easy operation: SIEMENS PLC full-auto controlling system
6 Stable quality, we have not received any passive talks from our customers
7 Oversea service, installation, staff training and technical support.
3D printer filament extruder consists of single screw extruder, water tank, tractor machine, laser, rolling up machine. its control system consists of intelligent temperature control table, imported electrical components and converter. Main feature of this line stable extrusion, good plasticizing effect, high degree of control precision, convenient operation etc.
Machine Composition
Item | Equipment Line | QTY/SET |
1 | Mixer Machine | 1 |
2 | Vacuum Loader | 1 |
3 | Hopper Dryer | 1 |
4-1 | Single Screw Extruder | 1 |
4-2 | Die Head | 1 |
5 | Water Tank | 1 |
6 | Tractor Machine | 1 |
7 | Storage Thread Stand | 1 |
8 | Roundness Laser | 1 |
9 | Rolling Up Machine | 1 |
10 | Vacuum Packing | 1 |
3D printer filament extruder date sheet
Model | GSD-16 | GSD-35 | GSD-45 | GSD-65 |
Screw diameter (mm) | 16 | 35 | 45 | 65 |
Screw L/D | 20:1 | 25:1 | 25:1 | 25:1 |
Heating zone | 3 | 3 | 3 | 4 |
Producing speed (m/min) | 8-10 | 60-80 | 60-100 | 60-200 |
Filament Diameter (mm) | 1.75, 3.00 | 1.75, 3.00 | 1.75, 3.00 | 1.75, 3.00 |
Tolerance (mm) | +/-0.05 | +/-0.03 | +/-0.03 | +/-0.03 |
Capacity (kg/h) | 1-2 | 8-15 | 15-30 | 30-50 |
Service
------Packing type: Wooden base plate, damp proof plastic lining, fully-closed plate-box external
------Delivery time: 45 days after receive the payment of deposit
------Payment: Deposit 40% by T/T in advance, delivery against payment of 60% balance after qualified acceptance
------Leave factory testing: before leaving factory, equipment should be tested by both parties. Test material offered by buyer
------Installation: we will send 1-2 technicians for machine’s installation and debugging according to customer’s requirement; the technician’s board and lodging and the round-trip airplane ticket expense undertakes by the buyer,additional service charge USD50.For each technician/one day, estimate 5-7 working days
------Guarantee period: Guarantee period is 12 months after getting the machine
------The supplier shall provide the service:(after pay the machine)
------the supplier to send adjustment of installation and commissioning
------the supplier direct buyer's technical personnel operating the machine
------The buyer shall provide the facilities and preparations:(Delivery machine to finish)
------foundation and adapter power supply water and compressed air pipe and related projects
------other interface equipment not listed above
------trial use of the raw material and product testing, inspection