Nanjing GS-mach Extrusion Equipment Co.,Ltd
24H Hotline:+86-18851021602 +86-15195907172
Place of Origin: | Made in Nanjing |
Brand Name: | GS-mach |
Certification: | CE IS9001 |
Model Number: | GSD-150 |
Minimum Order Quantity: | 1 |
---|---|
Price: | negoation |
Packaging Details: | Wooden cases and pallets |
Delivery Time: | 30 days |
Payment Terms: | T/T, L/C, Western Union |
Supply Ability: | 100 sets/ month |
Process Material: | Plastic Granules | Capacity: | 400~500kg/h |
---|---|---|---|
Model: | Single Screw Extruder Pelletizing Line | Voltage: | 220V/380V/440V/3P |
Size: | 14*0.9*1.7m | Color: | As Per Customers |
Extruder machine single screw extrusion line barrel for plastic extruder machine
GS-mach is a professional plastic,rubber and chemicals machinery researcher,designer and manufacturer with CE&ISO9001 certificates
Single screw extruder has a good stable quality, big capacity and easy self-clear function which are widely popular with the customer. So it can be used two stage extruder, that means twin screw extruder +single screw extruder, Kneader machine line, recycled pelletizing machine line.
Machine Composition
Model | Machine | Quantity |
1 | Belt Conveyor | 1 set |
2 | Single Screw Force Feeder | 1 set |
3 | GSD-150 Single Screw Extruder | 1 set |
4 | Electric Control System | 1 set |
5 | Water-ring Pelletizing System | 1 set |
If the single screw extruder is used for the second stage of two stage extruder, the total capacity will be higher than just one twin screw extruder. Second, the die head compress of twin screw extruder will be low down, the material quality will be more better.
If the single screw extruder is used for kneader line, the material will be highly capacity. The material will be disperse well.
If the single screw extruder is used for recycled pelletizing machine, the material is more easy to be fed the material well. The maintain and operation is more easy.
SO the single screw extruder play an important job in plastic machine industrial.
------Leave factory testing: before leaving factory,equipment should be tested by both parties.Test material offered by buyer
------Installation: we will send 1-2 technicians for machine’s installation and debugging according to customer’s requirement;the technician’s board and lodging and the round-trip airplane ticket expense undertakes by the buyer,additional service charge USD50.For each technician/one day,estimate 5-7 working days
------Guarantee period: Guarantee period is 12 months after leaving factory,damaged
------The supplier shall provide the service:(after pay the machine)
------the supplier to send adjustment of installation and commissioning
------the supplier direct buyer's technical personnel operating the machine
------The buyer shall provide the facilities and preparations:(Delivery machine to finish)
------foundation and adapter power supply water and compressed air pipe and related projects
------other interface equipment not listed above
------trial use of the raw material and product testing, inspection